Check Out the Best : ₿ "Bitcoin Miners" & "Dogecoin Miners"🐶
| Daily | Monthly | Yearly | |
|---|---|---|---|
|
|
$19.02 | $570.54 | $6,941.60 |
|
|
-$13.08 | -$392.40 | -$4,774.20 |
|
|
$5.94 | $178.14 | $2,167.40 |
Our Exclusive Mining Offers
Get in touch with our expert
Contact UsAssess Antminer S19 XP+ Hydro profitability using current Bitcoin mining conditions and real-time revenue estimates. Review daily earnings, electricity expenses, mining rewards and ROI potential to determine whether this high-performance 558TH/s SHA-256 hydro-cooled ASIC miner can deliver sustainable long-term returns.
Antminer S19 XP+ Hydro 3U is manufactured by Bitmain which operates under the SHA-256 algorithm with a maximum hashrate of 558Th/s and power consumption of 10602W.
| Manufacturer | Bitmain |
|---|---|
| Model | Antminer S19 XP+ Hydro 558Th/s |
| Size w/o | 900 X 486 X 132mm |
| Networking Connection Mode | RJ45 Ethernet 10/100M |
| Cooling | Hydrocooling |
| Noise | 50db |
| Power | 10602W |
| Interface | Ethernet |
| Storage Temp. | -20-70 |
| Temperature | 20 - 50 °C |
| Humidity | 10 - 90 % |
| Warranty | 365 Days |
The Bitmain Antminer S19 XP+ Hydro profitability calculator helps miners estimate potential earnings based on hashrate, electricity rates and current Bitcoin mining conditions. With a maximum hashrate of 558TH/s and advanced hydro-cooling technology, the Antminer S19 XP+ Hydro is designed for large-scale SHA-256 mining operations. Daily profits, monthly revenue and annual earnings can vary depending on Bitcoin price movements, mining difficulty and overall network competition.
Understanding profitability before deploying mining hardware is essential for evaluating return on investment. The Antminer S19 XP+ Hydro ROI analysis provides insight into electricity consumption, operational expenses and estimated mining rewards. By comparing projected revenue against power costs, miners can assess long-term earning potential and determine whether this hydro-cooled Bitcoin miner aligns with their profitability goals. Continuous monitoring of mining performance can help optimize returns as market conditions evolve.
The Bitmain Antminer S19 XP+ Hydro is a hydro cooled Bitcoin miner that delivers 586 TH/s on the SHA-256 algorithm while drawing 10,900 W. Its efficiency works out to 18.6 J/TH, and that figure matters more than the headline hashrate, because it decides how much of the mining revenue is left once the power bill is paid.
The unit comes in a 3U format and weighs 50 kg. Because the cooling is water based, it needs a hydro installation rather than simple airflow, so it suits farms and hosting facilities that already run water cooling loops.
At 10,900 W the machine consumes 261.6 kWh every 24 hours. The S19 XP+ Hydro electricity cost comes to $13.08 per day at a rate of $0.05 per kWh and rises to $26.16 per day at $0.10 per kWh. That cost is fixed for your rate, while revenue moves with the Bitcoin price and network difficulty, so the same hardware can produce very different results at different tariffs.
Enter your own power rate in the calculator above to see live earnings based on current network conditions.
This is a recent machine. Bitmain announced it on July 1, 2025 and launched it on July 30, 2025, so it is a new release rather than an aging model.
The history chart on this page shows how its daily results have followed the Bitcoin price and network difficulty over recent months. Read that trend together with your own electricity rate in the calculator, then weigh the outcome against the price listed on this page before you decide.
It draws 10,900 W, so it consumes 10,900 x 24 / 1000 = 261.6 kWh per day. That equals $13.08 per day at $0.05 per kWh and $26.16 per day at $0.10 per kWh.
It runs at 18.6 J/TH, meaning it uses 18.6 joules of energy for each terahash of work. That efficiency comes from delivering 586 TH/s on a power draw of 10,900 W.
It mines on the SHA-256 algorithm, and this page tracks its profitability mining Bitcoin. The live calculator above uses current Bitcoin network data.
Divide the price shown on this page by the live daily profit in the calculator above. The result is a rough number of days to recover the hardware cost at current conditions, and it will shift as the Bitcoin price and network difficulty change.
The Antminer S19 XP+ Hyd 3U draws around 10,900 W at the wall, which puts it firmly in industrial territory. It needs a stable, dedicated power supply and a circuit sized appropriately for that load, so plan on proper electrical work rather than sharing power with other equipment. Because it is a hydro cooled machine, a water cooling loop is also part of the installation, so the electrical setup and the cooling infrastructure should be planned together before the unit arrives.
In most cases, no. At 10,900 W of power draw and 50 kg of weight, the S19 XP+ Hydro 3U is designed for racks and prepared mining spaces rather than living areas. As a hydro cooled unit it requires a water cooling loop as part of the installation, which typical homes are not set up to provide. Home mining is usually the domain of low wattage air cooled miners, and even high wattage air cooled units demand serious airflow and wiring. A hydro machine like this one is a better fit for a hosting facility or a dedicated, purpose built space.
We are teamed up with VoskCoin to provide our customers with the latest innovations in cryptocurrency miners and an overview of the machine to the Crypto mining community. This will provide our customers with the latest crypto-mining tools and insights to help you succeed in this ever-evolving industry.